
On the evening of March 8, two GMC-96X rail grinding vehicles slowly rolled out of the industrial park of GEMAC Engineering Machinery Co., Ltd. (hereinafter referred to as GEMAC), bound by rail for the Guangzhou Locomotive Depot of China Railway Guangzhou Group Co., Ltd., where they will be put into rail grinding operations.
This marks the 30th set of track engineering equipment manufactured by GEMAC this year. The timely delivery of these critical products underscores GEMAC’s swift recovery in production capacity at the start of 2026, providing strong impetus toward achieving its first-quarter production and operational targets.
Li Guibo, the Journalist
Photo by Yu Shufan, the Correspondent
ALL RIGHTS RESERVED: Xiangyang China
Adress:73, Jingzhou Road, Xiangyang, Hubei, China tel: 86-0710-3610510
Email : xiangyangws@126.com